Surface Monitoring Projects
|
Contract No
|
Project Name
|
System Type
|
2009
|
GWA WDV
|
Gateway Avenue Woodsville Surface
|
1 X 1 3 X 1 |
|
| Pulau Tebus, Asia Petroleum Hub |
|
APH |
Pulau Tebus Asia Petroleum Hub – Instrumentation Monitoring |
210 Sensors |
|
Penta Geo-Bund, GPS Monitoring
|
|
PENTA |
Real Time Monitoring of 3 Uits of Leica GPS with Customized Specs |
|
|
| 2008 |
WDV WIK Sentosa IR UEC BVC Farrer Pk
|
Tunnel Woodsville MRT N & S Bounds 71 Wilkie Road MRT N & S Bounds Bridge Column Monitoring (Surface) UEC E & W Bounds Buona Vista MRT Station (Surface) Farrer Park MRT Station
|
2 X 3 2 X 1 2 X 1 2 X 1 1 X 1 2 X 2
|
|
| 2007 |
Robinson Sentosa IR Phoenix Hotel Somerset Sentosa IR |
Crosby House @Robinson Road Sentosa Island Integrated Resort (Surface) Phoenix Hotel Redevelopment
Somerset 5 Stories Building Ground Anchor Points Monitoring (Surface) |
2 X 2 3 X 1 2 X 2
2 X 1 2 X 1
|
| 2006 |
ORT |
Orchard Turn Tunnel Monitoring Project |
|
|
| 2005 |
8242D 8242J 8242K 8242L MRB C856 (8242)
LGB |
Pasir Panjang Shop Houses Mon (Surface) Pasir Panjang Shop Houses Mon (Surface) Pasir Panjang Shop Houses Mon (Surface) Pasir Panjang Shop Houses Mon (Surface) Marina Boulevard N & S Bound Pasir Panjang Viaduct Monitoring AMS is used and proven in this most difficult Surface Monitoring with influence of severe Atmospheric & Vibration caused by Heavy Traffic Lorong Gambir House over Tunnel Centre Line |
1 X 1 1 X 1 1 X 1 1 X 1
20 X 1
2 X 1
|
|
| Landslide |
| 2005 |
BBTnS |
Bukit Batuk Landslide Tunnel & Slope Monitor AMS was able to continuous monitoring report and alert with movement of >1.5m |
2 X 1 |
|
Bridge Monitoring
|
| 2004 |
|
Jurong Island Bridge Monitoring Monitoring of Gas Pipe below the Bridge Structures |
1 Single |
|
High Rise Building
|
| 2002 |
|
Church Street Building Monitoring Building Foundation Settlement & Inclination AMS is shown exact settlement and inclination of building comparing with surface marker and Electronic Level Beam |
1 Single |
|
|